Baiyun High-tech Rail Transit Industrial Base Project
This industrial infrastructure project of rail transit base selects GETO integrated solution of precast concrete PC components matched with formwork and scaffolding system, which adapts to the construction standards of large-span and heavy-load structures for rail transit factory buildings. Relying on the advantages of high-precision prefabrication and rapid assembly of PC components, it ensures both structural accuracy and construction schedule of large industrial buildings reach the standard.
