Climbing Formwork

Integrated Jacking Formwork System

编组 24
banner_Integrated Jacking Formwork System1
banner_Integrated Jacking Formwork System2

Integrated Jacking Formwork System

Climbing System

The Integrated Jacking Formwork System is an integrated elevated construction platform designed for advance core construction in super high-rise buildings. Attached to the cast-in-place vertical structure, the system is lifted by alternating hydraulic jacking cylinders, allowing the top formwork platform to rise continuously with the core structure. Depending on project requirements, it can be equipped with external protection frames, formwork suspension systems, placing booms, material platforms, and can also work together with climbing formwork systems. The system integrates enclosure, formwork operation, rebar fixing, concrete pouring, material handling, and curing into one elevated platform, enabling safer, more continuous, and more efficient construction of super high-rise core structures.

  • Self-jacking system attached to the vertical core structure.

 

  • Suitable for advance core construction in super high-rise buildings.

 

  • Can integrate external protection, formwork suspension, placing boom, and material platform functions.

 

  • Creates a stable, enclosed, and continuous elevated working space.

 

  • Adapts to complex structural changes such as wall thickness variation and inclined wall transitions.

 

  • Reduces temporary platform erection and labor input.

 

  • Provides all-weather construction support and reduces weather-related delays.

 

  • Enhances safety, continuity, and overall efficiency in super high-rise construction projects.

Inquire About Green Building & New Energy Solutions

Need quotes, specs, or cooperation info? Share your needs with us.

Upload

Picture